Garden State Earthworks replaced a guardrail and installed in embankment at a well-known New Jersey nursing facility. This project, which also included an abutment and installation of a new vehicular and pedestrian bridge, provided a drainage and dewatering solution for the facility’s units and patios. Not only did this project improve the facility’s safety, it created a beautiful addition with natural settings for its residents, staff and visitors.
Before Photos:
Workers building the walkway bridge.
Rebar supports for concrete to later be laid in to support the walkway bridge.
The metal frame of the bridge being lowered in.
Making final adjustments before the bridge is set in place.
Bridge is set in and final touches can now be applied.
Workers now rake gravel onto either side of the bridge to have a smooth transitional walkway.
After Photos:
Another angle of the newly installed bridge.
The newly replaced guardrail.
Another angle of the replacement guardrail.
New guardrails over vehicle bridge.
The end of the new guardrail.
More angles of guard rail over vehicle bridge.
More angles of new guardrails by road.